Sr.No. | NAME OF WORK | LOCATION AND PROJECT TYPE | NAME OF DEPARTMENT |
---|---|---|---|
Public Work Department | |||
1 | Improvement of Hadapsar to Kondhwa to Saswad MDR-60 Jejuri Nira Road
S.H 64 Km. 21/000 To 62/860 S.H. Km. 91/000 To 125/000 |
Jejuri, Tal. Purandar Dist: Pune Maharashtra India. Road Project | The Executive Engineer Integrated Unit, Pune |
2 | Improvements to Mangaon Mhansala road S.H. 97 (Improvements to Grade Curve in Ghonse Ghat) km 18/800 to 58/800 Tal.: MhansalaDist: Raigad | Mahad. Dist.Raigad 402301 Maharashtra, India Road Work | The Executive Engineer Public Work Division, Mahad |
3 | Prime Minister Gram Sadak Yojana, Package No.2306, Tal. : Mulashi, Bhor&Valhe and Package N9. 2308 Tal.: Junner Ambegoan & Khed | Tal:Bhor, Velhe, Mulashi. Maharashtra India. Road Work | The Executive Engineer ZillaParishad, Pune |
Irrigation Department | |||
4 | Mahabaleshwar Water Supply Scheme Constructing & mesonry dam up to stage 1 and Head Regulator at Mahabaleshwar, Dist: Satara | Mahabaleshwar Dist: Satara. Maharashtra India Dam Project | The Executive Engineer Minor Irrigation Division Satara |
5 | Construction of Minor Irrigation Tank at Bibi, Tal.Patan, Dist: Satara On turnkey basis project. | At, Bibi, Tal.Patan, Dist.Satara. Maharashtra India. Dam Project | The Executive Engineer Kanher Development Division, Satara |
6 | Construction K.T. Weir at Kothale, Candol (Patvan), Lakadwada, Kumbarvalan | Tal.Purandar Dist.Pune, Maharashtra India, K.T. Weir Work. | The Executive Engineer Minor irrigation Division (Local Sector) Pune. |
7 | Construction of Wang Medium Project Marathwadi Tal..Patan Dist Satara | Tal..Patan Dist. Satara. | The Executive Engineer MID Satara |
Irrigation Department | |||
8 | Construction of Nira Deoghar Right Bank Canal. Km.No.16 to 20, Earthwork and Structure , Tal. Bhor, Dist:Pune | Tal..Bhor, Dist-Pune Maharashtra India, Canal Work | The Executive Engineer Nira Deoghar Project Division Sangavi (Bhatghar) Tal..Bhor |
9 | Work of construction of Dhom Balkawadi Right Canal Km 22 to 27. Earthwork and structures etc. | Tal..Wai, Satara Maharashtra India. Canal Work | The Executive Engineer DhomBalakwadi Project Division Wai Satara |
10 | Construction of Percolation Tank at Rajori, Pisaware, Bhosalewadi, Pandeshwar Tak. Tal :Purandar Dist Pune | Tal.Purandar Dist.Pune, Maharashtra India, Percolation Tank | The Executive Engineer Minor irrigation Division, Pune |
11 | Earthwork and structure for chaskman Left bank canal Km 15 to 20 | Chaskman Pune Maharashtra India Canal Work | The Executive Engineer Chaskaman Project Division , Pune |
Maharashtra State Power Generation Co. Ltd. | |||
12 | Work of supply, Manufacture, transportation, providing, laying, testing and commissioning of 2000 mm dia M.S. Gravity pipe line including construction of out fall structure from Majalgoan Right Bank Canal to Khadaka Barrage of Augmentation of water supply from Parli Thermal Power Station | Parli VaijnathDist: Beed Maharashtra ,India MS Pipeline Project. | The chief Engineer (C) Gen 1,M.S.P.G.C.L., 1 ST Floor Estrella Batteries Expansion Building plot no.1 Dharavi Road, Mumbai - 400019 |
13 | Construction work of MSES 400 KV Sub-Station Project at Jejuri,Tal. Purandar, Dist Pune. a. Land Development b. WBM Road and side drain etc. c. Construction of permanent Rail track diamond crossing, Transformer Foundation & Fire Protection Wall. d. Area Development for 400 KV & 220 KV Switchyards at 400 KV R. S. Jejuri | Jejuri Dist: Pune Maharashtra India Land Development Road, Drainage, Foundation, MS Pipeline Retaining Wall and Gutter Project Jejuri Tal. Purandar Dist: Pune Maharashtra India Switchyards Projects | The Superintending Engineer, EHV Civil Construction cum Maintenance Circle, Pune - 411011 |
14 | New Parli Thermal Power Project 1 x 250 MW Unit I work of Land Development, Construction of UCR masonry retaining Wall, boundary walls WBM Roads Side Drain WMM & DBM RCC work Bridges | Parli Vaijnath Dist: Beed Maharashtra India Land Development, compound Wall and Internal Roads | The chief Engineer (C) Gen 1,M.S.P.G.C.L., 1ST Floor Estrella Batteries Expansion Building plot no.1 Dharavi Mumbai 400019 |
15 | Khaperkheda Thermal Power Station Expansion project 1 x 500 MW Diversion and Construction of R.C.C. Nalla For 500MW Unit at Thermal. Power Station, Khaperkheda | Khaperkheda Nagpur Maharashtra India RCC Nalla Project | The Chief General Manager (Civil) Gen 1, M.S.P.G.C.L. 1st floor Estrella Batteries Expansion Building, Plot No.1,Dharavi Mumbai - 400019 |
16 | New Parli Thermal Project 1x 250 MW Unit The work of Construction of Raw Water Reservoir R.W. Pump House, C.W. Pump House, C.W. channel, Pipelines and associated works at New Parli T.P.S. Dist: Beed | Parli Vaijnath Dist: Beed Maharastra India Raw Water Reservoir Project | The chief Engineer (C) Gen 1,M.S.P.G.C.L.,1ST Floor Estrella Batteries Expansion Building Dharavi Road, Mumbai-400019 |
17 | Area Development for the proposed 400/220 KV Sub Station at chakan, Tal.Khed, Dist:Pune | Chakan MIDC Dist: Pune, Maharashtra India. Land Development Project | The Superintending Engineer(c), EHV civil const. Cum Maintenance. Circle, Pune 411011 |
18 | Land Development & Nalla diversion at 220kv S/S at Niwali Phata Dist Ratnagiri | Niwali Phata Dist Ratnagiri Land Development &Nalla diversion | The chief Engineer MSEB Kasba Peth, Pune |
Maharashtra Industrial Development Corporation | |||
19 | Repairs to Amethan-Shinde PWD Road ( MOR No.20) WBM Approach Road for M/s Dow and bypass road to Plot of Dow | Chinchwad, Pune 411019 Maharashtra India Road Work | The Executive Engineer, Chinchwad MIDC Project Division Pune |
20 | Chakan Industrial Area Ph-II Improvement to existing MDR-17from SH - 55 Khalumbre - Savardhari- Bhamboli-Shinde Road | Chakan Industrial Area Maharashtra, Road Work | The Executive Engineer, Chakan MIDC Project Division Pune |
Industrial Project | |||
21 | Earthmoving and Blanketing Volkswagen India Pvt. Ltd. At shindegaon, Tal:Khed, Dist: Pune | Chakan MIDC Tal:KhedDist: Pune Maharashtra India Site Leveling and Compound wall, Drainage Project | Volkswagen Plant at Chakan A + S Consulting Germany Tal. :Khed, Dist : Pune |
22 | 22 General Site Grading Works construction Machinery manufacturing facility at chakan Pune of M/s Sany Heavy Industry India Pvt. Ltd | Chakan MIDC, Tal. .Khed Dist: Pune Maharashtra India Site Leveling and compound wall project | Mott Mack Donald 44 Dr R.G. Thandani Marg Worli Mumbai- 400018 |
23 | Construction of Ravin Cable Land Development at Markal, Tal. : Khed Dist : Pune | Industrial Project Chakan MIDC Markal Tal. Khed | Ravin Cables Tal. :Khed, Dist: Pune |
24 | Construction of Kothari Spinning Mill Co. Land Development & structure at Jejuri Tal. Purandar, Dist: Pune | Jejuri MIDC Dist Pune Maharashtra India Site Leveling | Mott Mac Donald 44 Dr RG Thandani Marg Worli Mumbai - 400018 |
25 | Civil Works for DOW Chemical International Pvt. Ltd. at Shindegoan, Tal., Khed Dist: Pune | Chakan MIDC, Tal., Khed Dist: Pune Maharashtra India Site Leveling and compound wall project | Rohit Mohit Construction, Goregao (E) Mumbai-63 |
26 | Construction of Civil Structural Work and Land Development ú for Seena Sugar Manufacturing Company Ltd. | Tal..Karjat Dist. Ahmednagar. | General Manager Seena Sugar Manufacturing Co. Ltd |
27 | Land Development work for New Holland Fiat (India ) Pvt. Ltd., Area Gradation work and Compound wall work for Indospace Rohan | Chakan MIDC Phase-II, Pune | General Manager New Holland Fiat (India) Pvt.Ltd. |
28 | Industrial Park,Khed Pvt.Ltd. | Chakan MIDC-Phase | Venkatramanan Associates |
Educational Projects | |||
29 | Construction of Engineering College Building at Pisoli, Tal. : Haveli, Dist. : Pune | Pisoli, Tal. : Haveli, Dist. : Pune. College Premises | President, KJ's Educational Trust |
Central Railway Work | |||
30 | Earthwork in embankment and cutting including side drains From Ch. 175 to 15000 in Ahmednagar Narayandoh section of Ahmednagar Beed Parli-Vaijnath New Bored Gauge. Line Project. | Ahmednagar Parli- Vaijnath Maharashtra India Railway Line Project | The Chief Administrative Officer 6th floor, New Administrative Building, Dadabhai Naoroji Road, Mumbai |
31 | Construction of Earthwork in embankment and cutting including side drains, bridges, buildings, roads, paving, laying and linking track supply of ballast and permanent way linking from Ch.0 to 26650m. At Lonand, Site Leveling Infrastructure works package for Solapur Super | Lonand, Phaltan, Tal..: Phaltan, Dist: Satara. Maharashtra India Railway Line Project | The Chief Administrative Officer 6th floor, New Administrative Building, Dadabhai Naoroji Road, Mumbai |
32 | Thermal Power Project (NTPC - LTD} A Govt. of India Enterprise. | Thermal Power Project. Fatatewadi Tal.South Solapur | Genral Manager, NTPC Solapur. |
33 | Constructing earthen work, structure and field channels (OFD-Part-1) at Sukhed Ch 53/815, O &M and handing over of Irrigation System to WUA Tal.Wai, Dist : Satara | At.Sukhed Tal. Khandala Dist.Satara. | Executive Engineer, Dhom Balkavdi Division, At.Wai,Dist.Satara. |
34 | Design Supply, Laying, Commissioning of 1450 mm IDMS Transmission Pipeline parallel to Existing 1700 mm OD MS pipeline from Adai to Kalamboli junction Navi Mumbai-NMMC | At.Kalamboli,New Mumbai. | Executive Engineer,(Morbe), Navi Mumbai Municipal Corporation. |
35 | Site Leveling and Infrastructure work of Roads and drain for NMDC at Steel Plant for 3.MTPA) Site at Nagarnar near Jagdalpur town in chattisgarh State. | At.Nagarnar,Dist .Bastar Chattisgarh | Genral Manager,NMDC Nagarnar NISP. |
36 | Section –II:- Earthwork in embankment & cutting from Chainage 26500 m to 35500m = 9.00 Km in the section between Loni Yard( Excluding) to Solapurwadi Yard ( Including) on Ahmednagar-Beed-Parli Vaijnath , New BG line project. | At. Solapurwadi Tal. Ashti, Dist: Beed. New BG line project | Central Railway, Engineering Construction Department Government of India |
37 | Section III: Earthwork in embankment & cutting from Ch. 35500m to 50250 = 14.750 km in the section between SUR wadi (Excluding) to Kada (Excluding) On Ahmednagar Beed-Parli-Vaijnath, New B. G. Line Project. (Old Alignment). | At. Solapurwadi Tal. Ashti, Dist: Beed. New BG line project | Central Railway, Engineering Construction Department Government of India |
38 | Ash Dyke Package for Soalpur Super Thermal Power Project (2X660MW). | Solapur Super Thermal Power Project, Fatatewadi-Po-Hotgistation, Tal.south Solapur, Dist: Solapur, | NTPC Limited, |
39 | Site Leveling and Infrastructure works-Package for Solapur Super thermal Power Project - (2X660MW) | Solapur Super Thermal Power Project, Fatatewadi-Po-Hotgistation, Tal.south Solapur, Dist: Solapur, | NTPC Limited, |
40 | Work of road and drain construction work for the 5x270 MW Nashik Thermal Power Project (Maharashtra.) | Sinner, Dist: Nashik, Thermal Power Project | Indiabulls |